Champion Group - product knowledge
High flash point safe alkyd protective coating
.
High flash point safety alkyd protective coating is a high flash point safety alkyd protective coating developed by Champion Group in order to meet the national requirements for hazardous chemicals management. The flash point is more than 60 ℃ (closed), which meets the requirements for non hazardous chemicals identification in the regulations on the safety management of hazardous chemicals. It is a non hazardous chemical identified by the authority, which has solved the problem of alkyd coating for a long time The storage and transportation of can be based on general chemicals, and the product also belongs to high solid sub environment-friendly coating, which meets the control requirements of the Ministry of environmental protection and local governments for VOC emission. The VOC content is less than 420g / L, which meets the national VOC emission standard for coating.
The resin refined from natural linseed oil and soybean oil, high flash point auxiliaries and solvents, and international advanced "clean production" process are selected. The group has Jiangsu provincial technology center and a complete set of high-end testing equipment synchronized by the national paint testing center. The product quality is excellent, with the advantages of high flash point, high solid content, low VOC content, high hardness, fast drying, good painting performance, bright color, full coating, good flexibility, strong adhesion, good outdoor weather resistance, long-term storage and non precipitation, which solves the traditional alcohol Acid coating is toxic to human body, with strong taste, poor environmental protection and pollution to surrounding environment.
Composition: medium and long oil alkyd resin, high weather resistant pigment, filler, auxiliary agent, high flash point environmental protection solvent, etc.
Features: it has good luster, full film, bright color, good outdoor weather resistance and reasonable price. It is the alkyd ready mixed paint with the highest cost performance in China. At the same time, the flash point is high, and the flash point is & gt; 60 ℃ (closed), which is a non hazardous chemical, so the transportation and storage are more convenient.
Application: it is widely used for protection and decoration of steel surface and wooden components such as general indoor and outdoor railings, steel structures, mechanical equipment, etc.
Color: white, black, bright red, iron red, purple red, orange yellow (Orange), medium yellow, medium blue, sea blue (peacock blue), medium green, bright green (green), gray
Luster: highlight (≥ 85)
Theoretical dosage: 7-8 ㎡ / kg (calculated by 40 μ m dry film, excluding loss)
Specific gravity: about 1.2-1.3
Drying time: 25 ℃ surface drying ≤ 2h, solid drying ≤ 24h
Flash point: 71 ℃
Storage period: 12 months
Coating method: spray, brush and roll coating (bubble will be produced).
Surface treatment: if the front paint surface has been polluted, appropriate methods can be used to remove the surface oil, dust, etc., and the substrate shall be dry.
Matching coating: front coating: alkyd primer or intermediate paint.
Test report and appraisal certificate
Safety technical description
1. This product is a non hazardous chemical and can be stored or transported as a general chemical.
2. Waste coating slag and used coating barrel shall be collected and placed as required, and shall not be disposed at will.
3. The product should be stored indoors to avoid exposure to the sun, away from open fire, heat source, strong acid and alkali, oxidant, and children's contact.
4. If swallowed, please immediately warm water to induce vomiting, and immediately send to the hospital for treatment.
5. The construction site shall have good ventilation facilities, and no fireworks are allowed on the construction site.
Construction precautions
1. Skinning and sedimentation after opening the tank.
Skinning: in case of skinning after opening the tank, please use the filter screen to remove it before normal construction. Skinning is not a product quality problem. It is a protective film formed on the surface of the coating due to the shock of the coating during long-distance transportation, air leakage, oxidation reaction between the coating and air. During the construction, please use the screen to remove the crusts. After filtering with the screen, the normal construction can be carried out without affecting any product quality indicators!
Sediment: if there is any sediment, please use a tool bar to reach into the bucket and stir to distinguish whether it is soft or hard. If it can be easily stirred evenly, this is a normal phenomenon, in the standard normal range. If the sedimentation is very hard and it is difficult to mix, it is beyond the normal range. It is recommended to stop the construction and directly return it to the manufacturer.
2. Dilution: when diluent is used to adjust the viscosity according to the construction situation, please use our company's matching exempt solvent or high flash point industrial coating general water for viscosity adjustment. After adding, please stir vigorously for 3-5 minutes to make it completely dissolved. Do not use the market circulation of low diluent, because this product is an environmental protection product, adding other diluents will not only reduce the product quality, but also affect this product Environmental protection performance of the product.
Warning: our company will not be responsible for any problems caused by using non matching products. Generally, the dosage of diluent is about 20%.
3. Construction tools: the coating can be air spray, brush and roll painted. Bubbles are easy to be produced during roll painting. The use of short hair roller can reduce the generation of bubbles. It is not suitable to construct when the relative humidity is more than 85%. It is strictly prohibited to construct in rainy, snowy and foggy weather. After construction, the coating shall be well protected before drying, and it is strictly prohibited to contact with rainwater and collision. Each spraying should be 20-25 μ m, and the second spraying can only be done after the first spraying is completely dry. It can be dried naturally or at low temperature (the maximum temperature is no more than 60 °).
4. Substrate treatment: before construction, the oil, impurities, dust and rust of the substrate shall be removed. The surface to be coated shall be clean, flat and free of oil, dust, wax, etc. If there is an old coating on the base material, it must be polished with fine sandpaper before construction. Please carry out the test before construction to avoid the reaction with the old coating film affecting the product performance.
5. Matching system: if the primer is needed, we can use our fast drying alkyd antirust primer or special alkyd antirust coating for steel structure (common for the bottom). If the primer is not our company, please carry out the experiment, so as not to affect the product performance due to non matching. Our company will not be responsible for the problems caused by the non matching products of our company.
Note: the data, use and suggestions of the above products are given based on the experience in test and actual use, and are only used as construction reference. For the construction we do not know, our company only guarantees the quality of paint products. In case of any change to the above data, the latest instructions of the company shall prevail without further notice.